Hi Vamsi, You are correct! I had made a typing mistake. After realizing my mistake, I had sent a post with the correction. I hope you (all) received it. From SAP, with F1 in field "Selection date" in VL01N Procedure If you also enter a sales order number, the system checks the delivery selection date against each schedule line for each item. If either the material availability date or the transportation planning date falls on or before the delivery selection date, the system copies the item into the delivery. PS - in VL10, field "Delivery Creation Date" also check the above, during the processing of delivery creation. Regards, Typewriter
| | | ---------------Original Message--------------- From: Vamsi Mohan Sent: Friday, August 05, 2011 10:08 AM Subject: Selection date in delivery Hi Typewriter, If the Material is available = 10.08.2011 Transport is arranged on = 7.08.2011 Why would the system throw error if we attempt to create delivery in VL01N by giving the selection date = 15.08.2011 (which is later then above two dates). If we try to create delivery much before the above two dates only system would give error because ATP has not confirmed. Please correct me. Thanks, Vamsi | | __.____._ Copyright © 2011 Toolbox.com and message author. Toolbox.com 4343 N. Scottsdale Road Suite 280, Scottsdale, AZ 85251 | | Typewriter SAP Logistics Sales and Distribution Enthusiast
Contributed 100 posts in a group to earn a Bronze Achievement Popular White Papers In the Spotlight _.____.__ |