Thanks but it is not answer for my question :) You explained me how material determination works - I know (more or less) how it work - the question was - it is possible to set up material determination in this way thay NOTHING HAPPEN as long as material A is available and system will propose new material only if material A in not available. Now system propose me material B or C even if A is available and I don't want it.
| | | ---------------Original Message--------------- From: Peter M Sent: Friday, May 13, 2011 7:29 AM Subject: Material determination and availability check in this way... Hi, I have a question - it is possible (and how?) to set up system to work like this: 1. Material A - 100 PC on the stock 2. Material B - 120 PC on the stock 3. Material C - 150 PC on the stock I set material determination in this way that for Material A set Material B and Material C as a sybstitute materials with screen selection. And now I create sales order: 1. Put Material A - quantity - till 100 PC - nothing happen - material i s avaliable - all is OK. 2. Material A more that 100 PC - popup screen appear with materials B and C to choose. I read in SAP documentation such part: In automatic product selection (reasons for substitution 0004 and 0006), the system automatically replaces the requested material if it is unavailable. If automatic product selection is being used, the system may display (based on Customizing) the entered and substituted material as main items and sub-items in the sales order. This part "if it is unavailable" doesn't work for me because even if I put Material A 80 PC (available 100) - system replace it by Material B. What I'm doing wrong? | | __.____._ Copyright © 2011 Toolbox.com and message author. Toolbox.com 4343 N. Scottsdale Road Suite 280, Scottsdale, AZ 85251 | | Popular White Papers In the Spotlight _.____.__ |