RE:[sap-log-sd] Scope of Check Availability

Posted by Guest
on Dec 6 at 6:50 PM
Hello,

1. Change the material master in the affected plant.
2. Go into the sales order via change and go into the item shipping tab.
3. Delete the plant (and storage location, shipping point).
4. Press enter.
5. Reenter the plant, shipping point (and storage location if you specify it sales orders).
The system will automatically redetermine the checking rule and carry out a new availability check.

Regards.

---------------Original Message---------------
From: Bob Schmidt
Sent: Tuesday, November 29, 2011 8:35 AM
Subject: Scope of Check Availability

We have recently made a change to our way of doing business. As a result many of our sales orders exist with an out-of-date Availability Check/Checking Rule. These orders are scheduled out into the future and would not self-purge in the near future. Is there a way I can update the scope of check for these sales orders?

Thank you

Bob Schmidt
Operations

__.____._
Copyright © 2011 Toolbox.com and message author.

Toolbox.com 4343 N. Scottsdale Road Suite 280, Scottsdale, AZ 85251
Mark as helpful
View this online
  
Popular White Papers

In the Spotlight
Have an SAP Question? Ask Your Peers at Toolbox for IT

_.____.__