[sap-log-sd] Procurement cycle for write off material

Posted by saeed_akhter (Sap Consultent)
on Aug 8 at 6:05 AM
As discussed, with below customer requirement, below are the summarized objective which they want to achieve:

Material (RM/PM) upon customer request needed to be write Off from the system (Company valuated stock).
Stock will be send back to RB Physical Location at GAC

This stock need too be visible in the consignment stock location for RB or any other location (without value)
In future , if RB requires these material to reuse , and during MRP run system should consider the available stock( Without Value for RB Location ) and give the proposal for shortage quantity
PO need to be raised to RB ( For stock at RB location only) and as well as regular vendor ( For shortage Quantity Only) for that particular materials , to bring back this material in our valuated stock followed by Invoice recording and payment.

For any further clarification, please let me know.
__.____._
Copyright © 2011 Toolbox.com and message author.

Toolbox.com 4343 N. Scottsdale Road Suite 280, Scottsdale, AZ 85251
View this online
  
Popular White Papers

In the Spotlight
Earn Recognition for Your Contributions at Toolbox for IT. Gain Points for Community Achievements
_.____.__