[sap-log-sd] Issue with Delivery - Overallocation of material

Posted by Darcy Morse
on May 19 at 8:38 AM
Scenario 1– Plant 3000, Storage Loc 3000 is tied to Shipping Point 3000.
Material 1 has quants in 2 bins. Bin A has 100 pieces, Bin B has 100 pieces.
A sales order is placed to Shipping Point 3000 for a quantity of 150.
When the delivery is created, a transfer Order is created for 100 pieces out of Bin A and 50 out of Bin B.

Scenario 2 – Plant 3000, Storage Loc 4000 is tied to Shipping Point 4000.
Material 1 has quants in 2 bins. Bin A has 100 pieces, Bin B has 100 pieces.
A sales order is placed to Shipping Point 4000 for a quantity of 150.
When the delivery is created, a transfer Order is created for 150 pieces out of Bin A. This is an overallocation.

This was tested with the same customer number, same part number. What could I be missing to make Scenario 2 act like scenario 1? We are using FIFO. VL01N used to create the delivery as needed.

This is consistent with all materials.
__.____._
Copyright © 2011 Toolbox.com and message author.

Toolbox.com 4343 N. Scottsdale Road Suite 280, Scottsdale, AZ 85251
View this online
  
Popular White Papers

In the Spotlight
Toolbox.com Groups Discussions Support BBCode. Share Code Snippets with Peers
_.____.__